Designer
Raises assumptions and hazards
Records assumptions where the requirements are unclear, assesses design hazards, and sees exactly where each one stands.
Two tools for the construction industry, built to replace the register that gets exported to PDF and emailed around. The assumptions manager takes every assumption through check, acceptance and validation. The CDM Risk Manager records and assists duty holder reviews whilst supporting management of the residual risk transfer process. Both tools keep a live record visible to all project parties and can be tailored to your project. We provide a process, not just a tool.
| ID | Assumption | Risk | Reliance | Action needed |
|---|---|---|---|---|
| PILOT-A-07 | Existing retaining wall adequate for the new loading | High | Awaiting acceptance | Contractor and client to accept |
| PILOT-A-12 | Utility diversion complete before piling starts | Medium | Accepted · limits recorded | Validation due 3 Dec |
| PILOT-A-15 | Groundwater level as per 2019 ground investigation | Very high | Not yet checked | With the checker |
The problem
On most projects, the assumptions register and the design risk register are spreadsheets. They are reviewed in a meeting, exported to PDF and emailed round. Between meetings nobody can see where things stand, and the decisions are scattered across inboxes.
How most registers run today
With Crestwale
Assumptions Management Tool
Early accessDesign starts from requirements. Where the requirements are not yet clear, project teams make assumptions, and each assumption carries a risk that someone owns: the client, the designer or the contractor.
The Assumptions Management Tool captures each assumption with its risk, takes it through check and acceptance, and tracks it until it is validated. The whole project team works from the same register, so nobody is waiting for the next PDF.
| ID | Assumption | Risk | Reliance | Action needed |
|---|---|---|---|---|
| PILOT-A-07 | Existing retaining wall adequate for the new loading | High | Awaiting acceptance | Contractor and client to accept |
| PILOT-A-12 | Utility diversion complete before piling starts | Medium | Accepted · limits recorded | Validation due 3 Dec |
| PILOT-A-15 | Groundwater level as per 2019 ground investigation | Very high | Not yet checked | With the checker |
How an assumption moves
Where a requirement isn't clear, the design engineer records the assumption, the risk if it turns out wrong, and the documents it rests on.
The design lead checks it. The checker must be a different person from the engineer who raised it.
The originator chooses who must accept: the contractor, the client, or both. Each must decide. Silence is not acceptance.
As the design develops, evidence validates or disproves the assumption. Its risk is retired, or stays open until the impacts are dealt with.
New assumptions appear as the design moves on. Link them to the ones they depend on or replace, so the chain stays visible.
As assumptions are validated and closed, the project dashboard shows the risk exposure coming down.
CDM Risk Management Tool
Early accessUnder regulation 9 of the Construction (Design and Management) Regulations 2015, designers must eliminate, so far as is reasonably practicable, foreseeable risks to anyone carrying out or affected by construction work, maintaining or cleaning the structure, or using a structure designed as a workplace. Where a risk cannot be eliminated, they must, so far as is reasonably practicable, reduce it or, failing that, control it through the subsequent design process, and provide information about it to the principal designer.
The CDM Risk Management Tool gives the whole project one risk register. Designers identify and assess hazards. The contractor and client review what remains, and each residual risk is accepted by the party who will manage it, on site or once the asset is in use. This is the risk transfer process: a project process that builds on the CDM duties.
| Ref | Residual risk | Level | Stage | With |
|---|---|---|---|---|
| DR-011 | Buried HV cable across piling zone B | High | Construction | Contractor · managed on site |
| DR-017 | Confined space in culvert C3 for maintenance | Medium | Maintenance | Client · awaiting acceptance |
| DR-021 | Rooflight access for cleaning | Medium | Accepted | Client · accepted 12 Nov |
The risk transfer process
Designers identify foreseeable risks from their design to anyone carrying out or affected by construction work, and to those who maintain, clean or use the structure.
Each hazard is risk assessed and, so far as is reasonably practicable, eliminated through the design, or reduced, or failing that controlled.
What remains is recorded as residual risk, and the information goes to the principal designer.
The contractor and client review the residual risks. Many are managed by the contractor on site during construction.
Risks that remain once the asset is built move to the maintenance stage for the client to review, and into the health and safety file.
The client or contractor accepts each residual risk. Every review and acceptance is recorded, so the transfer can be audited.
Tailored to your organisation
Every client and every contract runs design governance a little differently. The core product covers the common ground. Beyond that, we fit the tools to your approval routes, your information and your reporting, and we build custom workflows when your project needs them.
The core product adapts to each project without custom work. We set it up with you.
When your client, your contract or your own governance needs something the core product does not do, we build it for you.
How a custom engagement works
Share your current register, your approval routes, and what your client or contract asks of you.
We map your process onto the tools and agree what is set-up and what needs building, before any work starts.
We set up your projects, and build the custom workflows, fields or reports your process needs.
Your people try it with your own records before it goes live, and we refine it with you.
Custom work is scoped and agreed with you before it starts. Tell us what you need when you join the waiting list.
Who it’s for
The design team, the contractor and the client each work in the register with their own role. The CDM principal designer sees every designer’s residual risks in one place.
Designer
Records assumptions where the requirements are unclear, assesses design hazards, and sees exactly where each one stands.
Checker & design lead
Sees what is waiting, checks with recorded authority, and keeps the register moving between meetings.
Contractor
Accepts the assumptions it relies on, and reviews the residual risks it will manage during construction.
Client
Logs in to the live register instead of waiting for a PDF, accepts assumptions and residual risks, and gets a clean record at handover.
About Crestwale Solutions
Solutions that Last.
Crestwale Solutions builds practical tools for design management on construction and infrastructure projects. Our tools grew out of running design on live projects and wanting one place where the assumptions a project relies on, and the risks its design creates, could be kept straight with a record that lasts.
We are opening access to a small number of teams first, working alongside them to set up their projects and to shape their projects. If that sounds like your team, join the waiting list or email us at hello@strandedsolutions.co.uk.
Paid pilot
We are inviting a small number of design teams to run a paid pilot of the Assumptions Management Tool on a live project. We set it up with you, support your team throughout, and review the results together at the end.
A good fit if you have a project in design now and keep your assumptions register in a spreadsheet. The scope, length and fee of each pilot are agreed with you before it starts.
Waiting list
We open access in small groups so every team gets set up properly. Here is what happens next: